The whole journey in one picture
Hardware is built in phases. Each phase answers a bigger question and commits more money than the one before, so the same mistake costs more the later you find it. The multipliers below come from the Chapter 1 game; the book's short version is the 100× rule.
Click a phase to jump to its definition. At the end of each phase is a gate: a go / no-go decision. The hardest lesson is holding the gate when the evidence says not yet.
Terms
No term matches that. Try a shorter word.
AOI · Automated optical inspection
A machine that photographs boards after soldering and checks them against a program. Its silence can mean good quality or just loose tuning, which is why you ask for the escape audit.
Appears in: The Quiet Machine (factory book) · The Audit (factory book)
BMS · Battery management system
The electronics in a battery pack that protect it: cutting off on over-charge, over-discharge, over-current, short circuit and temperature. Verify the programmed values against your spec, not the factory's assurance.
Appears in: Behind the Fire Door (factory book)
BOM · Bill of materials
The full list of parts in a product, with quantities and suppliers. A BOM that works for 10 prototypes can still be impossible to buy at 10,000 units.
Bottleneck
The station with the longest cycle time. It sets the capacity of the whole line: 3,600 seconds divided by its cycle gives units per hour. You find it by the pile of work waiting in front of it.
Appears in: Read the Line (factory book)
Burn rate
How fast the team spends cash, per week or month, even when nothing is being built. Slow progress is expensive because the burn continues.
Appears in: Chapter 1 game · Chapter 2 game
CAPA / 8D · Corrective and preventive action
A structured way to fix a problem and stop it recurring. An 8D is the report: contain it, find the root cause, fix it, prevent it. A good 8D names a root cause. A weak one says "operator retrained" every time.
Appears in: The Audit (factory book)
Cell aging
Resting freshly built cells for a period and measuring their self-discharge, to find the marginal ones. It deliberately concentrates the riskiest cells in one place, so the aging room needs fire separation, spacing and temperature control.
Appears in: Behind the Fire Door (factory book)
Certification
Mandatory lab testing for selling in a market (for example CE in Europe, FCC in the US). A design change after certification can mean a cert re-test, with new fees and delays.
Appears in: Chapter 5 game
Checkweigher
A scale on the packing line that weighs every box against its SKU tolerance. A missing manual, a missing cable or the wrong accessory changes the weight. Its reject log is worth asking for.
Appears in: The Last Gate (factory book)
Clear-to-build report
A document produced against a specific work order shortly before its start, listing every BOM line with required quantity, physically kitted or on-shelf quantity, and the gap. The operative word is physically: a report that restates the ERP is worthless. Demand it 72 hours before every build.
Appears in: Clear to Build (factory book)
CM · Contract manufacturer
The factory that builds your product for you, often through a web of subcontractors for molding, painting or battery packs. You audit the CM and, through it, the web.
Appears in: The Audit (factory book)
Contingency
Time or money deliberately held back for the problems you cannot predict yet. A plan with none is a plan that is already late.
Appears in: Chapter 3 game
Cost-of-change curve
The same mistake costs more the later you fix it. In the Chapter 1 game each phase multiplies the price (roughly ×1 in prototyping, ×5–10 in EVT, ×20–50 in DVT, ×50–100 in PVT, ×100–500 in mass production). The book's short version is the 100× rule: a mistake that costs €1,000s in prototyping can cost €100k to €1M+ in production.
Appears in: Chapter 1 game
Counterfeit
A part sold as something it is not: remarked date codes or speed grades, refurbished parts sold as new, or fakes. Counterfeit risk is channel risk: authorised distribution carries almost none, brokers carry real exposure that peaks where the shortage is.
Appears in: The Dock (factory book)
Critical path
The chain of dependent tasks that decides the earliest possible finish. Delay anything on it and the whole project slips. Work off the path can slip a little without moving the date.
Appears in: Chapter 3 game
Cycle count
Counting a rotating sample of locations continuously, weighted so fast-moving and high-value parts are counted most, with every discrepancy investigated to its root cause. The annual count is the least informative count in the industry.
Appears in: Clear to Build (factory book)
Dual-sourcing
Building the same product at two factories (or buying a part from two suppliers). It is insurance and leverage, and it cannot be created in the month you need it: qualifying a second source takes months.
Appears in: The Long Run (factory book)
DFM · Design for Manufacturability
Designing the product so a factory can build it reliably and cheaply: tolerances a real process can hold, parts that can be sourced at volume, an assembly sequence that works on a line. The book treats it as a discipline from the first sketch, not a review at the end.
Appears in: Chapter 2 game · Chapter 3 game
DOE · Design of experiments
A planned set of trial runs that varies the settings on purpose to map where the process makes good parts and where it does not. It turns "five good parts" into a picture of the process window.
Appears in: The Process Window (factory book)
DFA · Design for assembly
Designing the product so people (or machines) can put it together quickly and correctly the first time: parts that locate themselves, screws you can reach, connectors that only fit one way. A flaw here shows up as workarounds on the line, long after the tools are cut.
Appears in: Watch the Hands (factory book)
DVT · Design Validation Test
The design is now frozen close to final. Hard tooling is cut, accredited labs run certification and reliability tests, and the first sample run is built. The question is does the finished design pass? Changes now are expensive because steel is involved.
Appears in: Chapter 5 game
E&O · Excess and obsolete
The bill for parts the factory bought on your forecast that you never used. Fixed by buy-against rules, liability bands and substantiation, written at signature.
Appears in: Clear to Build (factory book) · The Deal (factory book)
ECO / ECN · Engineering change order / notice
The formal record of a design change: what changed, why, what it affects and who approved it. Late in a project, every ECO has a price tag and often a certification consequence.
EMC · Electromagnetic compatibility
Whether the product avoids disturbing other equipment with radio noise and keeps working when others disturb it. Tested in a lab for certification. A layout decision made months earlier can make a product fail.
Epidemic-failure clause
A contract term that, above a defined field-failure rate traceable to workmanship, extends the factory's liability beyond replacing units to the event costs: retrieval, screening and rework. Capped, but non-zero.
Appears in: The Deal (factory book)
Escape audit
A standing sample of boards that the AOI passed, re-inspected by a human or by test-failure correlation, with the escapes counted and classified. It is the only way to learn the escape rate, and it has no daily constituency inside a factory.
Appears in: The Quiet Machine (factory book)
Evidence standard
Every claim is tested against a document or an observation. A claim that can be tested against neither is recorded as a claim. "We do SPC" becomes "show me this week's chart".
Appears in: The Audit (factory book)
EVT · Engineering Validation Test
The first build with a near-final design on real parts. The question is does the design work? Expect many problems: this phase exists to find them. Teams triage each issue to an owner and fix the serious ones before the EVT gate.
Appears in: Chapter 4 game
Factory audit
Two days at a candidate factory, run by someone who knows what good looks like in every area, before you commit. It is the highest-leverage exercise in the factory relationship because everything the partnership will later struggle to change (the partner, the terms, the walk-away) is still free. From The Hardest Factory Lessons →
Appears in: The Audit (factory book)
FAI · First article inspection
The first units after any set-up are built, inspected exhaustively against your BOM, drawing and records, and formally approved before the line runs at rate. The hold rule, that the line waits until FAI closes even when the schedule screams, is the sharp edge.
Appears in: The Quiet Machine (factory book)
Field failure
A fault that shows up with customers. It is the most expensive place to find a problem: returns, a possible recall, and lost trust.
FIFO · First in, first out
Using the oldest stock first, so reels do not age on the shelf. In a warehouse it is only real if the layout and the scanning enforce it.
Appears in: Clear to Build (factory book)
First-pass yield · FPY
Of the units that entered a stage, the fraction that passed with no rework, retest or touch-up. FPY is the process speaking. The number you are usually shown is final yield, after rework, which hides it. Meaning comes from the gap between the two.
Appears in: The Quiet Machine (factory book)
Gauge R&R · Repeatability and reproducibility
A study of the tester itself: measure the same units repeatedly, with different operators and fixtures, and see how much of the tolerance is just measurement noise. If the gauge uses a third of the tolerance, a fail may be a pass and a pass may be a fail.
Appears in: The Last Honest Report (factory book)
Gemba
The place where the work is done. "Going to the gemba" means standing at the line and watching what hands actually do, instead of reading the report. Wasted motion and workarounds are the design telling you what is wrong.
Appears in: Watch the Hands (factory book)
Gate
A formal go / no-go checkpoint at the end of a phase. You pass it when the evidence says the product is ready, not when the schedule says it is time. The title of the Chapter 1 game, Hold the Gate, is the central lesson of the book.
Appears in: Chapter 1 game · Chapter 4 game · Chapter 5 game · Chapter 6 game
Golden sample
A known-good unit (and a known-bad one) run through the fixture before each shift. If it reads wrong, the fixture has drifted or worn, and you fix it before the lot, not after the yield dips.
Appears in: The Last Honest Report (factory book)
Guardband
Test limits set tighter than the spec to leave room for measurement noise and for drift in the field. It rejects some good units near the edge, and that is the price of not shipping marginal ones.
Appears in: The Last Honest Report (factory book)
HALT · Highly accelerated life test
Deliberately stressing units (extreme temperature, vibration, combined) beyond their spec until they fail, to learn where the weak points are. In the Chapter 6 game you push units in the HALT chamber: too little teaches nothing, too far destroys scarce units.
Appears in: Chapter 6 game
Interface issue
A problem at the boundary between two teams or subsystems, such as firmware and power, or enclosure and board. It looks like one team's business but needs both. Nobody owns it until someone says so.
Appears in: Chapter 4 game
IQC / OQC · Incoming / outgoing quality control
The inspection of parts arriving at the dock (IQC) and of finished goods before shipping (OQC). The dock is the cheapest place in the system to find that a component is wrong.
Appears in: The Dock (factory book) · The Audit (factory book)
Lab slot
A booked time at a test lab. Labs have queues. Miss your slot and the gate moves, which is why the Chapter 5 game makes you book them in time.
Appears in: Chapter 5 game
Jig and fixture
A holder that positions a part or guides a tool so the operator does not have to. It is the right fix for a workholding or positioning problem, and the wrong fix for a flaw that is really in the design.
Appears in: Watch the Hands (factory book)
Last buy
Your right to place a final order at prevailing prices with defined lead times when the relationship ends, so your market continuity does not depend on its mood.
Appears in: The Deal (factory book)
Latency profile
How long each request for evidence takes. Seconds: a real, lived system. An hour: records exist but are not used. A meeting: records are being created for you, possibly right now.
Appears in: The Audit (factory book)
Lien (on tooling)
The factory's claim that it may hold your tooling against unpaid invoices. It bites exactly when you most need the tooling back, so carve it out at signature.
Appears in: The Deal (factory book)
Sink, flash, warp and short shot
The four classic injection-moulding defects. Sink: a dimple over a thick section. Flash: a thin fin where the tool halves meet. Warp: a part that distorts as it cools unevenly. Short shot: the cavity did not fill. Each has a process lever and a tool cause, and the lever for one often causes another.
Appears in: The Process Window (factory book)
Mould
The steel (or aluminium) block with a cavity that gives injection-moulded plastic parts their shape. You can cut more steel away later; you cannot add it back, so changes are costly. That is what the Chapter 5 game is about.
Appears in: The Process Window (factory book) · Chapter 5 game
MP · Mass production
Regular production at volume. Problems missed upstream now cost line halts, re-tests and possibly field recalls. The book puts the cost of a mistake here at €100k to €1M or more.
Appears in: Chapter 1 game
MRB · Material review board
The group that decides what happens to rejected material: scrap, return, rework or use as is. Under schedule pressure it is where good parts policy bends.
Appears in: The Dock (factory book)
MSD · Moisture-sensitive device
A component that absorbs moisture from the air and can be damaged during soldering if it has been exposed too long (its floor life). Dry cabinets, stickers and logs control it.
Appears in: The Dock (factory book) · The Audit (factory book)
NRE · Non-recurring engineering
One-time charges for fixtures, test development and line set-up (and often tooling). Small numbers with long-lived consequences, because they decide who owns what.
Appears in: The Deal (factory book)
Open issue
A known problem that is not yet closed. At a gate, each open issue needs an owner, a plan, a date, and an honest estimate of what it costs if you defer it.
Appears in: Chapter 1 game · Chapter 4 game · Chapter 5 game
P1 (and P2, P3)
The first prototype that brings the separate streams together into one working unit. P2 and P3 are the follow-up rounds that fix what P1 showed. Each round is a chance to retire risks before money gets committed to tooling.
Appears in: Chapter 2 game
PCN · Process change notice
A formal notice that something in the build is changing: a component, a supplier, a process step, a test. The factory must send one and wait for your approval. The changes that hurt are the ones that never get a PCN.
Appears in: The Long Run (factory book)
Phantom stock
Inventory the system says exists but the shelf does not hold (system 3,000, shelf 1,200). It is the mid-build shortage, incubating: the planning run saw 3,000 and promised your build against it.
Appears in: Clear to Build (factory book)
Pilot units
The batch built in PVT to prove the line works. The Chapter 6 game uses 200. What you measure on them (yield, defects, rework) is what you can expect at volume.
Appears in: Chapter 6 game
Poka-yoke
Mistake-proofing: a design or fixture feature that makes the wrong action impossible, such as a keyed connector or a part that only sits one way. It removes the need to rely on attention.
Appears in: Watch the Hands (factory book)
PRD · Product Requirements Document
Says what the product must do and for whom, in terms you can test. If a requirement cannot be tested, it is a wish, not a requirement.
Appears in: Chapter 3 game
Pre-ship audit right
A clause in the quality agreement giving you, or a named third-party inspector, the option to open N boxes from any lot before the truck is loaded, against the pack BOM and label spec. The cheapest insurance in the packing chapter.
Appears in: The Last Gate (factory book)
Process window
The region of settings (melt temperature, pack pressure, cooling time) where the process makes good parts. A wide window survives resin lots, weather and tool wear. A narrow one passes the sample and fails in month four. If the window is a sliver, the cause is usually the steel, not the settings.
Appears in: The Process Window (factory book)
Prototype
An early build made to test an idea cheaply. The book (and Chapter 2 game) splits prototypes by the question they answer: Looks like (shape, size, feel in the hand), Works like (the electronics and function, on a bench) and Feels like (materials and user experience). Mistakes found here cost the least you will ever pay.
Appears in: Chapter 2 game
PVT · Production Validation Test
A pilot build on the real production line, with production tooling, fixtures and operators. The question is can the factory build this, repeatedly, at the yield and quality we need? Whatever is wrong here gets found with no schedule buffer left.
Appears in: Chapter 6 game
Quarantine
A physically or systemically segregated state where rejected material cannot be issued to production while the material review board decides: return, scrap, sort or use as is.
Appears in: The Dock (factory book) · Behind the Fire Door (factory book)
Re-spin
Making a new revision of a circuit board to fix a problem. In prototyping it costs days and a few thousand euros. After tooling and certification, the same fix can cost far more.
Resident engineer
Someone of yours stationed at the factory. They see problems early, make the reports truthful, and raise your priority. They cost money, and they are usually the cheapest quality system you can buy.
Appears in: The Long Run (factory book)
Readiness gate
The check before a pilot run starts: is the line set up, are parts and fixtures in place, are the operators trained? Starting a pilot on an unready line wastes the units and the schedule.
Appears in: Chapter 6 game
Red line
A finding that ends an evaluation regardless of score: falsified records, quality without power, refusing subcontractor disclosure, refusing reference checks, safety disqualifiers, labour or EHS violations. It is a character bar, not a quality bar: quality improves with investment, character does not.
Appears in: The Audit (factory book)
Reluctance map
A running chart of what the factory would prefer you not see: the areas where the escort speeds up, the doors that stay closed, the questions that produce a translation delay longer than the sentence. It is also the chart of where to spend your time.
Appears in: The Audit (factory book)
Retest loop
Testing a failing unit again until it passes. It hides intermittent faults and gauge noise inside a flattering final yield. Ask for first-pass yield and the retest rate, and cap retests in writing.
Appears in: The Last Honest Report (factory book)
Risk register
A list of the things that could go wrong, each with an owner, how likely and how damaging it is, and the cheapest test that would reveal it. Chapter 2's risks pop up from it. Get a template →
Appears in: Chapter 2 game
Scan gate
A station that scans each unit and blocks it from moving on if something does not match: unit serial against the box label, label version against the released artwork, accessory lot against the pack BOM.
Appears in: The Last Gate (factory book)
Stay or go
The hardest judgement call in manufacturing: fix the relationship, split the volume, or move. It should follow evidence (measured yield, change history, priority in a crunch, the exit option you have built), not sunk cost or the factory's latest apology.
Appears in: The Long Run (factory book)
Single-source
A part that only one supplier can provide. If that supplier runs short, raises prices or stops, production stops with it. Often locked in unnoticed because the part was easy to get for prototypes.
Sponsor confidence
How much the person funding the programme still believes in it. In the Chapter 3 game, repeated mistakes drain it, and at zero the programme is put on hold.
Appears in: Chapter 3 game
Takt time
The time each unit has to take at the pace the customer needs: available seconds per shift divided by units required. A line meets its quoted rate only if its slowest station is no slower than takt.
Appears in: Read the Line (factory book)
T1 sample
The first parts from a new tool, made to check that the tool works. Five good T1 samples show the molder can make a good part once. They do not show how robust the process is, so ask for the process window as well.
Appears in: The Process Window (factory book)
Testable requirement
A requirement with a number, a unit, a test method and a pass/fail line. "Battery lasts long" is not testable. "At least 8 hours of the standard use profile at 25 °C" is.
Appears in: Chapter 3 game
Thermal runaway
A lithium cell overheating faster than it can shed heat, which can spread cell to cell. Lithium events announce themselves minutes before they commit, which is why detection and distance matter more than heroics.
Appears in: Behind the Fire Door (factory book)
Thin quote
A quote visibly below the competitive band. It is not a bargain, it is a strategy: the discount gets recovered through change orders, requotes, mid-life price rises and a switching cost. Interrogate it, and if you take it, arm the contract at full strength.
Appears in: The Deal (factory book)
Thread pull
Pick one serial number from last month's shipments and walk it backwards at the factory's own terminals: test history, rework, work order, kit, component lots, shipment. It audits the connections that binders cannot fake and a tour cannot show.
Appears in: The Audit (factory book)
Tooling
The moulds, dies and fixtures used to make parts and units at volume. Hard tooling is cut in steel: it can run very large production volumes and is very expensive to change.
Appears in: Chapter 5 game
Tooling release
The decision to start cutting production tooling. After this, changes cost real money and weeks. Release it on evidence (thermal, fit, tolerances, assembly checked), not because the schedule says so. Get a checklist →
Appears in: Chapter 5 game
Traceability
The recorded chain linking supplier lots to your serialised units. It is built at the dock, when material enters, and cannot be reconstructed later. Lot-level traceability scopes a recall to the affected builds; unit-level (for critical parts such as cells) scopes it to the affected units.
Appears in: The Dock (factory book) · The Last Gate (factory book)
TRD · Technical Requirements Document
Turns the PRD into technical limits and interfaces: power budget, size, temperature range, connectors, who owns which interface. It says how well and within what limits.
Appears in: Chapter 3 game
WIP · Work in progress
Units sitting between stations. A uniform small buffer shows controlled flow. A pile in front of one station, empty after it, is a live bottleneck. Alternating full and empty is a variation wave.
Appears in: Read the Line (factory book)
Yield
The share of units that pass every test the first time, without rework. A yield that looks fine at 50 units can be a crisis at 5,000.
Appears in: Chapter 6 game
One hardware lesson a week, free
Short, blunt lessons from the book: the mistake, what it costs, what to do instead. No spam, unsubscribe any time.
Learn it by playing, keep it with a checklist.
Six short games, one per chapter. Free printable checklists for each gate.
Play the games →Free templates →